Saria Weight Per Foot: 2, 3, 4, 5 & 6 Sutar Chart (2026)

Saria Weight Per Foot: 2, 3, 4, 5 and 6 Sutar Chart
Every steel handover ends the same way: the munshi counts bars, the kanta (weighing scale) weighs them, and the two numbers disagree. The argument lasts five minutes when both sides know the saria weight chart — and half an hour when they do not. Here is the chart we keep at the Khokhar Traders counter for 2 sutar to 6 sutar, with the formula behind it so you can check any size yourself.
First: what is a sutar?
1 sutar (sooter) = 1/8 inch = 3.175 mm. Pakistani sites still size saria in sutar while the mills mark it in mm:
- 2 sutar = 6.35 mm
- 3 sutar = 9.53 mm
- 4 sutar = 12.7 mm
- 5 sutar = 15.88 mm
- 6 sutar = 19.05 mm
The saria weight chart (2 sutar to 6 sutar)
| Sutar | Diameter | Weight per foot | Weight per meter | 1 bar (40 ft) | Bars per ton (approx) |
|---|---|---|---|---|---|
| 2 sutar saria weight | 6.35 mm | 0.075 kg | 0.25 kg | 3.0 kg | about 330 |
| 3 sutar saria weight | 9.53 mm | 0.17 kg | 0.56 kg | 6.8 kg | about 146 |
| 4 sutar saria weight | 12.7 mm | 0.30 kg | 1.00 kg | 12.1 kg | about 83 |
| 5 sutar saria weight | 15.88 mm | 0.47 kg | 1.56 kg | 18.9 kg | about 53 |
| 6 sutar saria weight | 19.05 mm | 0.68 kg | 2.24 kg | 27.3 kg | about 37 |
Bars-per-ton assumes standard 40-foot (12.2 m) lengths. Mills' bundle counts vary a little, which is exactly why steel is paid for by weighed weight, never by counted bundles.
The formula behind the chart
- Weight per meter = d × d ÷ 162 (d in mm) — so 4 sutar: 12.7 × 12.7 = 161.3, and 161.3 ÷ 162 = 1.0 kg per meter
- Weight per foot = d × d ÷ 531 — so 4 sutar: 161.3 ÷ 531 = 0.30 kg per foot
Worked example: your slab needs 200 feet of 4 sutar. 200 × 0.30 kg = 60 kg. At a per-ton rate, divide by 1,000 for the per-kg price and multiply by 60 — that is the line item your bill should show.
Which size goes where in house construction
| Size | Typical use |
|---|---|
| 2 – 3 sutar | stirrups (kangoo), column and beam ties, small binders, chairs |
| 4 sutar | slab distribution steel, small lintels, short spans |
| 5 sutar | slab main steel for rooms, small beams |
| 6 sutar | column main bars, beam steel, heavier spans |
Every structure is different — the drawings decide, not the chart. But when a munshi orders "6 sutar for slab steel" on a small room, you now know what the chart says about where that belongs.
Paying for saria: by weight, not by guess
Steel in Pakistan is priced per ton, and every honest deal converts the same way: per-ton rate ÷ 1,000 = per-kg rate; per-kg rate × weighed weight = your bill. Two habits protect you:
- Re-weigh on arrival. The truck-side kanta is standard practice — stand and watch it.
- Count-and-weigh a sample bundle. Bar weight × counted bars should match the claimed bundle weight within a percent or two.
For today's market, our sariya rate guide explains how prices are moving, and our steel grades guide covers Grade 60 vs older grades and what the rib markings mean. For a chart that extends to the bigger sizes, see the 3 to 8 sutar weight chart.
Frequently asked
4 sutar sariya weight per foot? About 0.30 kg per foot (1.0 kg per meter, 12.1 kg per 40-ft bar). The formula: 12.7 × 12.7 ÷ 531.
2 sutar saria kahan use hoti hai? Stirrups, ties and binders — the small steel that holds the main bars in position. It is not used as main structural steel.
3 sutar saria weight per foot? About 0.17 kg per foot, or 0.56 kg per meter — a 40-foot bar weighs about 6.8 kg.
How do I check the weight I was billed for? Counted bars × chart weight per bar = expected weight. Compare with the kanta reading. Within 1–2% is normal; beyond that, ask questions before paying.
Order steel with the numbers ready
Tell us your slab, beam and column schedule — or just the total running feet by size — and we will quote by weighed weight with Grade 60 stock. Call +92 331 5083 648 or contact us. To estimate steel tonnage for the whole house, use the Steel Calculator, and for the basics in Urdu, see our cement-sariya Urdu guide.
Ordering & Rates — Confirmed on Call
Material rates change daily, so we confirm everything directly with you.
Today's rate, not yesterday's: Cement, steel, bricks, sand, crush and paint rates move with the market, sometimes daily. Call or WhatsApp +92 331 5083 648 and our team confirms the day's exact figure for your brand and quantity in minutes.
Straight, itemised quotes: Tell us your material list — a paper chit, a photo of your plan or just your plot size and stage. You get brand, grade and quantity spelled out, and the figure is locked only with an official order and advance payment.
Everything confirmed personally: Availability, quantities, timing and how the material reaches you — we confirm all of it with you directly before anything is finalised. No surprises at loading.
Full details in our Contact page — or call / WhatsApp +92 331 5083 648 and we will go through your list and today's rate in minutes.
Good to Know Before You Act
Two honest notes about everything published in our guides.
We don't publish fixed rates: material rates in Pakistan change daily, so nothing on this site is a price list. The final and correct rate is always the one our team confirms with you on the day. Call or WhatsApp +92 331 5083 648 for today's exact figure — a rate is locked only with an official order and advance payment.
Guidance, not instructions: quantities, mix ratios and methods described in our guides are general educational guidance for your specific site you should verify — outcomes depend on site conditions, water quality, handling, curing, storage and workmanship. Before you act, always speak with your engineer, contractor or a qualified professional — or ask our team for guidance on materials.
Planning a stage of your project? Contact us first — we will gladly go through your material list, today's rate and the right products for your site before you buy.
Related Articles
10 Mistakes to Avoid When Buying Building Materials in Pakistan (2026)
Most building material losses in Pakistan never show up on a receipt: cement that lost strength in storage, bricks judged by colour alone, sand accepted without a test, steel never weighed. Ten mistakes to avoid — and the simple checks that catch them.
Building Materials List for a 5 Marla House (With Quantities)
The full 5 marla grey-structure material list in one place — bricks, cement, steel, sand and crush quantities, stage by stage, from the yard that supplies Jhelum daily.
Bricks Required for a 5 Marla House: Single vs Double Story (2026)
The phone rings: '5 marla double story — eent ka number bata do, truck aaj bharna hai.' Here is the full brick count for a 5 marla house, single and double story, with the wall-by-wall working.