Thursday evening, 8 pm, the phone rings: "Ground floor only — 5 marla ke liye kitni eent lagti hai? Munshi ko Monday tak number chahiye." That call comes in some form almost every week, so here is the full answer in writing — the short number, the maths behind it, and a worked example you can check your munshi against.

The short answer

A straightforward 5 marla ground floor — covered area roughly 1,000 to 1,150 sq ft, normal 10 to 10.5 ft ceilings, typical room count — lands between 22,000 and 30,000 awwal bricks. With higher ceilings, extra partitions, a mumty and an attached boundary wall, the same house can reach 35,000 or more. A complete two-storey 5 marla house commonly totals 50,000 to 60,000 bricks across both floors.

If anyone gives you one exact number without asking about your rooms, ceilings and walls — they are guessing. The range is honest because houses differ.

The maths behind it (so you can check any estimate)

Brickwork is estimated by volume. The planning rule used on Pakistani sites:

  • 1 cubic foot of finished brick masonry ≈ 13 to 14 bricks (that includes the normal mortar joints; add another 5–10% for breakage and wastage from kiln loading to roof lifting).
  • So if you ever wondered "how many bricks in 1 cubic feet" — plan with 13–14 per cft, or about 480–500 bricks per cubic metre.

From there, wall area converts like this:

Wall typePer 100 sq ft of wallCubic feetBricks (approx)
9-inch main wall100 sq ft × 0.75 ft75 cft1,000–1,050
4.5-inch partition wall100 sq ft × 0.375 ft37.5 cft500–525

That is the whole system: measure wall faces, multiply by thickness, multiply by 13.5, then add wastage.

Worked example — a 25×50 plot (5 marla)

Assume a 25 × 50 plot (1,250 sq ft), ground floor covered around 1,000 sq ft, walls 10.5 ft high:

ElementWall faceVolumeBricks
Main 9-inch walls (perimeter about 132 running ft)~1,386 sq ft~1,040 cft~14,000
Internal 4.5-inch partitions (about 90 running ft)~945 sq ft~354 cft~4,800
Lintels over doors/windows, sills, small bands—~110 cft~1,500
Mumty, stair area, kitchen and tank masonry—~150 cft~2,000
Subtotal~22,300
Wastage 10%~2,200
Planning total~24,500

That is exactly why we quote the band as 22,000–30,000: your room layout and partition count are what move the number.

What pushes the count up

  • 12 ft ceilings instead of 10 — adds a fifth to every wall.
  • More rooms — every partition is a 4.5-inch wall that eats bricks.
  • Boundary wall included in the order — a 5 marla compound wall alone can add thousands.
  • Mumty, overhead tank base, septic tank masonry, kitchen platforms — small items that together surprise people.
  • Brick size itself — field bricks vary a little between kilns; smaller bricks mean more per cubic foot. This is one more reason the wastage margin exists.

Ground floor only vs the full house

The first floor usually needs slightly fewer bricks than the ground floor — no boundary work, often fewer large rooms — but the mumty and parapets add some back. Plan the full two-storey house at 50,000–60,000 and refine per floor when drawings are final.

Awwal, doem or fly ash?

The quantity maths above assumes standard kiln bricks laid in 9-inch and 4.5-inch walls. Awwal (first-quality) is what we recommend and sell for main walls; doem can be discussed for less critical work. Fly ash bricks are a different size, so the per-cubic-foot count and the mortar sums change — read our brick types guide before deciding, and check quality at the kiln, not on the phone.

Ordering without waste

Bricks move on trolleys, and our trolley rates within roughly the local Jhelum area of Jhelum city include supply — the rate we quote on the phone covers the load arriving at your gate. When the trolley lands, count pieces from one layer and multiply; it takes two minutes and keeps everyone honest. Leftover bricks never go to waste either — sills, khaka and small repairs always eat them.

One caution: brick rates change often, so we do not print numbers here. Call or WhatsApp +92 331 5083 648 for today's rate, then place the order — an order locks the rate for that load.

Before ordering thousands of bricks, run your wall list through the free bricks calculator and compare with your munshi's figure. And whatever the count, sizes of walls, lintels and bands should come from your own engineer or contractor — they have seen your drawing; we have not.

Ordering & Rates — Confirmed on Call

Material rates change daily, so we confirm everything directly with you.

  • Today's rate, not yesterday's: Cement, steel, bricks, sand, crush and paint rates move with the market, sometimes daily. Call or WhatsApp +92 331 5083 648 and our team confirms the day's exact figure for your brand and quantity in minutes.

  • Straight, itemised quotes: Tell us your material list — a paper chit, a photo of your plan or just your plot size and stage. You get brand, grade and quantity spelled out, and the figure is locked only with an official order and advance payment.

  • Everything confirmed personally: Availability, quantities, timing and how the material reaches you — we confirm all of it with you directly before anything is finalised. No surprises at loading.

Full details in our Contact page — or call / WhatsApp +92 331 5083 648 and we will go through your list and today's rate in minutes.

Good to Know Before You Act

Two honest notes about everything published in our guides.

  • We don't publish fixed rates: material rates in Pakistan change daily, so nothing on this site is a price list. The final and correct rate is always the one our team confirms with you on the day. Call or WhatsApp +92 331 5083 648 for today's exact figure — a rate is locked only with an official order and advance payment.

  • Guidance, not instructions: quantities, mix ratios and methods described in our guides are general educational guidance for your specific site you should verify — outcomes depend on site conditions, water quality, handling, curing, storage and workmanship. Before you act, always speak with your engineer, contractor or a qualified professional — or ask our team for guidance on materials.

Planning a stage of your project? Contact us first — we will gladly go through your material list, today's rate and the right products for your site before you buy.